Tell us about your shift pattern

Start with a profile, then adjust any figure.

The shift pattern
Working the same part family.
hrs
Two shifts is 16.
Including any weekend running.
52 less shutdown and holidays.
The work
min / unit
Machine running, per good unit.
One changeover per batch.
min
Real work, so taken off before utilisation.
How much of that time you actually get
Current utilisation ?The share of remaining time the machine actually spends cutting. Most factories that have never measured it land between 50% and 65%. If you do not know, start at 60%. 62%
Breakdowns, waiting for material, waiting for a decision, running slow.
If utilisation reached 75%
Same machines, same people, fewer stops.

Email these results

Get your capacity figures as a PDF, with the utilisation gap spelled out.