Capacity

Capacity planning software

Find out whether you have the machine hours, the people and the shifts to deliver what you have promised, before you promise it.

Definition

What is capacity planning software?

Capacity planning software compares the work you have committed to against the hours you genuinely have available, at each machine, cell and skill group, and shows you where you will fall short.

It answers a question most factories answer with a shrug: can we actually do this? Not in theory, and not if everything goes perfectly, but with your real shift patterns, your real absence rate and your real changeover times.

The number that matters is not what a machine could produce. It is what it produces on a normal week, including setups, breakdowns, breaks and the operator being pulled onto something urgent. Planning against theoretical capacity is how factories end up on permanent overtime.

See it live

Load against hours, resource by resource

The scheduler shows committed work dropped onto real available hours at each machine and cell, so an overloaded week looks overloaded before it arrives.

Shift patterns, holidays and downtime are in the calculation, which is why the answer matches what the factory can actually do.

  • Week-by-week load per resource
  • Overloads visible before release
  • What-if moves without committing
Explore planning and scheduling →
DynamxMFG scheduler showing capacity load

How it works

How capacity planning works

It is a comparison of two numbers, and both of them are usually wrong the first time you look.

Work out available hours

Shift patterns, holidays, planned maintenance and a realistic allowance for absence and breakdown. This is nearly always lower than people assume.

Work out required hours

Every open job, exploded into operations, each with its expected run and setup time at a specific work centre.

Load one against the other

Required hours are dropped onto the available hours week by week, resource by resource, showing where load exceeds what exists.

Decide what to do about it

Overtime, subcontract, re-sequence, move work to another cell, or tell a customer early. All four are better than finding out in week six.

Capabilities

What capacity planning gives you

Load versus available

A week-by-week picture of committed hours against real hours at each resource.

Bottleneck identification

The resource that caps your output, shown rather than argued about.

Overload warnings

Weeks that cannot be delivered, flagged while there is still time to act.

Skill and labour view

Capacity is people as well as machines, and often people are the tighter constraint.

Scenario testing

What happens to the load if you take this order, or lose that machine for a week.

Realistic lead time

A quotable lead time based on how loaded you already are.

DynamxMFG demand and capacity report

The real numbers

Capacity from what actually happens

Booked times feed the capacity model, so when an operation consistently runs over its standard, your planning numbers correct themselves.

The demand report turns that into a forward view: what is coming, where it lands, and which weeks break first.

  • Times from real bookings, not standards
  • Demand landed by week and work centre
  • Evidence for the overtime or invest decision
Explore manufacturing intelligence →

Benefits

What knowing your capacity changes

Most capacity problems are not capacity problems. They are visibility problems that became capacity problems.

You stop over-promising

The commonest cause of late delivery in a small factory is accepting more work than the month contains, because nobody was counting.

Overtime becomes a decision

Planned overtime costs less than emergency overtime, and far less than the customer credit note that follows missing the date.

Investment gets evidence

Knowing which resource has been at 98 per cent load for six months turns a capital request into an argument the board can check.

Subcontract gets cheaper

Deciding in week one to subcontract an overload is a negotiation. Deciding in week five is a rescue, and it is priced like one.

Levels of detail

Rough-cut or detailed capacity planning?

Two different exercises, used at different points, and confusing them wastes a lot of effort.

Rough-cutDetailed
QuestionIs this plan roughly feasible?Exactly when does each operation run?
Resources modelledKey constraints onlyEvery work centre and skill group
Time bucketsWeeks or monthsHours or shifts
Effort to maintainLowHigh, needs accurate routings
Used forAccepting orders and quoting lead timesReleasing and sequencing work
Good enough forMost UK SME manufacturersHeavily constrained, capital-intensive plants

Right for you?

When capacity planning earns its place

If more than one of these is true, you are almost certainly planning against a capacity figure that does not exist.

  • Overtime has become routine rather than exceptional.
  • You accept orders without any check on whether the weeks concerned are already full.
  • One machine or cell is obviously the constraint but nobody has quantified by how much.
  • Lead times quoted to customers are the same regardless of how loaded you are.
  • You are considering buying a machine or hiring, and the case rests on a feeling.
  • Holiday season regularly causes a delivery crisis that surprises everybody.

DynamxMFG

Capacity based on what your factory really does

Capacity planning is only as good as the times behind it. Most factories plan against standard times that were set years ago, often optimistically, and then wonder why the plan never holds.

DynamxMFG builds capacity from booked times on real jobs. When an operation consistently takes 40 minutes rather than the 25 in the routing, that shows up, and your capacity figures start reflecting the factory you actually have.

Real times, not standards

Capacity derived from what operators actually booked. See shop floor data capture.

Machine and labour load

Both constraints modelled, because people are often the tighter one. See resources and workforce.

Feeds the schedule

Capacity limits flow straight into production scheduling.

Integrations

Connects to what you already run

Capacity decisions ripple into purchasing and promising. DynamxMFG connects planning, stock and your accounts stack so one set of numbers drives all three.

See all 33 integrations →
Xero logo
HubSpot logo
Sage logo
Microsoft Excel logo
Microsoft Outlook logo
QuickBooks logo
Make logo
Business Central logo
Google Sheets logo
Gmail logo
Salesforce logo
Microsoft 365 logo
ClickUp logo
Google Drive logo
Microsoft Dynamics logo

Customers

What manufacturers say about DynamxMFG

“DynamxMFG is an excellent choice for manufacturers looking to digitise operations without being overwhelmed by complexity.”

Kristopher S
Service Engineer at Protea

“As GMC has grown, it had become harder for me to have such a keen view on components to see if those parts were profitable or not. DynamxMFG enabled us to monitor the machine time and see whether we are making a profit or a loss on each component.”

Paul B
Managing Director at GMC

“The ability to dynamically modify BOMs after release, adding or removing items from work orders, scrapping and reworking parts, has been the single biggest improvement for our business.”

Andrew T
Managing Director at Protea

“We chose the system over competitors because of its ease of use, strong customer support and friendly delivery team. So far, everything has matched what was promised.”

Amy M
Head of Operations at Elite Skills Arena

“With DynamxMFG, all our production processes are tracked and the relevant data is captured. This increases our control over the business and helps us identify more opportunities to enhance efficiency and quality.”

Neil S
Operations Director at QK-TEX

“Our experience has been positive, and it was definitely worth switching. The support we have received has been extremely helpful. My favourite feature is the integration and automation capabilities.”

Philippos F
Head of Digital Transformation at CPL

Questions

Capacity planning questions, answered

What is the difference between capacity planning and scheduling?

Capacity planning asks whether there are enough hours in total. Scheduling decides the order those hours get used in. You need the first before the second is worth doing.

How do I work out my real available hours?

Start from shift hours, then subtract planned maintenance, holidays, training and a realistic allowance for absence and breakdown. Most factories find the real figure is 15 to 25 per cent below the theoretical one.

Should I plan capacity for people or machines?

Both, and in a lot of UK SME factories skilled labour is the binding constraint rather than machine time. Modelling only machines hides the real problem.

What utilisation should I target?

Not 100 per cent. A resource loaded to full capacity has no ability to absorb variation, and queues in front of it grow rapidly. Most factories run their constraint in the 80s and everything else lower.

Do I need this if I subcontract overflow?

Especially then. Knowing early that you will overload gives you a negotiation with your subcontractor rather than an emergency.

How far ahead should I plan capacity?

At least as far as your longest material lead time, and ideally as far ahead as your order book gives you visibility.

Related reading

Read next

Background reading on capacity planning software from the DynamxMFG glossary and blog.