Industry · Automotive Suppliers

Hit every tier 1 delivery target,
with full component traceability.

DynamxMFG gives automotive component manufacturers the delivery performance data, component traceability and call-off scheduling tier 1 customers expect, without building it by hand in spreadsheets.

Sound familiar?

Tier 1 customers demand data you are currently producing by hand

Automotive supply chain standards are high. Without the right system, meeting them costs your team hours of manual work every week and leaves customer relationships dependent on individuals rather than processes.

Delivery reports built manually overnight

Someone spends the night before a tier 1 review pulling figures from spreadsheets, cross-referencing despatch records and formatting a report. It is error-prone and leaves no time to spot issues before the meeting.

Component recall means days of investigation

When a tier 1 raises a quality concern you need batch, shift, operator and machine data for the affected parts. Without job-level traceability that investigation takes days, and every hour damages the relationship.

Call-off changes mean rebuilding the schedule

Tier 1 customers change call-off quantities and dates at short notice. Each change forces a manual reschedule, pulling sheets and reordering priorities, so planning reacts rather than controls.

Side by side

Spreadsheets and generic ERP vs DynamxMFG

Generic ERP records transactions, while DynamxMFG tracks production in real time and captures the traceability automotive customers require.

DynamxMFGSpreadsheets and generic tools
Component traceabilitySerial or batch, operator, shift and machine per partManual records, incomplete or missing
Delivery performance reportingInstant reports from live production dataCompiled manually before each review
Live job statusReal-time across all work centresFloor walk required to check progress
Job costingLive cost against estimate per works orderOnly visible after invoicing
Call-off changesUpdate quantity and date, schedule adjustsManual reschedule from scratch

What you get

The data tier 1 customers expect. Captured automatically.

DynamxMFG captures the production data tier 1 customers require at the point of production, not assembled the night before a review.

Component Traceability

Every component carries a traceable record: serial or batch number, the operator who worked on it, the shift, the machine and every inspection result against the works order. When a tier 1 raises a concern you have the full production history in seconds.

Replaces: paper travellers, separate quality files, manual recall investigations

Delivery Performance Reporting

DynamxMFG records actual despatch dates against planned dates for every works order, so on-time delivery figures are available from the dashboard at any point. GMC used this visibility to reach 94% on-time delivery and CPL reached 99.9%.

Replaces: manually compiled despatch reports, overnight preparation before reviews

Call-Off Schedule Management

When a tier 1 revises a call-off, update the quantity and date and the schedule adjusts. The shop floor sees updated priorities immediately, with no full reschedule and no version control problems on a shared spreadsheet.

Replaces: master scheduling spreadsheets, manual shop floor briefings

Quality and NCR Management

Record inspection results within each works order and raise non-conformance reports directly against the affected job. Assign corrective actions, track progress and close them with evidence attached. First-article records live in the production record rather than a paper file, so the evidence is there when a customer asks for it.

Replaces: paper NCR forms, separate quality spreadsheets, disconnected corrective action logs

Call-offs

Call-off changes absorbed, not rebuilt

A tier 1 revises a quantity on Tuesday and still expects the date honoured on Friday. In DynamxMFG you change the quantity and the date on the call-off, and the schedule moves with it. Revised priorities reach the shop floor immediately, with no sheets to pull apart.

Because the schedule is linked to real work centre capacity, you can see what a change costs before you agree to it. The knock-on effect on every other job sits on the same screen, so the answer you give the customer is one you can hold.

  • Revised call-offs reach the floor immediately
  • Capacity impact visible before you commit
  • One live schedule, no spreadsheet versions
DynamxMFG call-offs view for Automotive Suppliers

The numbers

What manufacturers get from DynamxMFG

40+

built-in reports, from live production data

90 days

from kick-off to running on the floor

40%

more production capacity at GMC

99.9%

on-time delivery at CPL

Rated 4.1/5 on Capterra, GetApp and Software Advice. Our ratings come from public review platforms, not testimonials we picked ourselves.

Getting started

Live in 90 days, not 18 months

We handle the implementation. Your team stays focused on production. Here is what your first 90 days look like.

DAYS 0-30

Establish visibility and a trusted baseline

The first month replaces spreadsheet chaos and guesswork with a single source of live production data.

DAYS 31-60

Regain control and remove obvious waste

With live data in place, your team shifts from reactive firefighting to data-driven action.

DAYS 61-90

Prove the ROI and prepare to scale

The final phase turns your operational improvements into financial evidence.

Customers

What manufacturers say about DynamxMFG

“DynamxMFG is an excellent choice for manufacturers looking to digitise operations without being overwhelmed by complexity.”

Kristopher S
Service Engineer at Protea

“As GMC has grown, it had become harder for me to have such a keen view on components to see if those parts were profitable or not. DynamxMFG enabled us to monitor the machine time and see whether we are making a profit or a loss on each component.”

Paul B
Managing Director at GMC

“The ability to dynamically modify BOMs after release, adding or removing items from work orders, scrapping and reworking parts, has been the single biggest improvement for our business.”

Andrew T
Managing Director at Protea

“We chose the system over competitors because of its ease of use, strong customer support and friendly delivery team. So far, everything has matched what was promised.”

Amy M
Head of Operations at Elite Skills Arena

“With DynamxMFG, all our production processes are tracked and the relevant data is captured. This increases our control over the business and helps us identify more opportunities to enhance efficiency and quality.”

Neil S
Operations Director at QK-TEX

“Our experience has been positive, and it was definitely worth switching. The support we have received has been extremely helpful. My favourite feature is the integration and automation capabilities.”

Philippos F
Head of Digital Transformation at CPL

Questions

What automotive manufacturers ask us

Does DynamxMFG support component traceability for recalls?

Yes. Every component carries a serial or batch number linked to the operator, shift, machine and inspection results recorded against the works order. A recall investigation becomes a search rather than a multi-day exercise across paper travellers and separate quality files, so you can tell a tier 1 exactly which parts are affected.

How does it handle tier 1 call-off changes?

You update the quantity and date on the call-off and the schedule adjusts, with revised priorities visible to the shop floor immediately. There is no full manual reschedule and no shared spreadsheet to keep in version control, so planning stays in front of the change rather than reacting to it.

Can we produce delivery performance reports for customer reviews?

Actual despatch dates are recorded against planned dates for every works order, so on-time delivery figures are available from the dashboard at any time rather than compiled the night before a review. The same live data feeds over 40 built-in reports, which means you can walk into a review with evidence rather than estimates.

Do we need to replace our ERP?

No. DynamxMFG adds the shop floor execution and traceability layer alongside your existing ERP or finance system, and integrates with Sage, Xero, QuickBooks and Microsoft Business Central. Orders, customers and invoices sync automatically, so your finance team keeps the system it already knows and nothing has to be ripped out.

How long does implementation take?

90 days from kick-off, against 12 to 18 months for a traditional ERP implementation. The DynamxMFG team handles data migration, configuration and training for both shop floor and office users, and configures routings, work centres and quality fields around the way your plant already runs.

See every component. Every job. Right now.

Book a 30 minute walkthrough on your own components, your call-off patterns and your factory layout.

Book a Demo