Industry · Aerospace & Defence
Audit ready traceability,
on every single build.
DynamxMFG records every operation with a time, a job and an operator automatically, giving aerospace and defence manufacturers a complete electronic audit trail, live build status, and quality data captured at every stage.
Sound familiar?
The compliance burden, every day
What slows down quality-critical, certification-driven manufacturing is rarely the machining. It is proving what happened afterwards, and doing it without losing days to the archive.
Audits mean digging through paper
Proving what happened, when and by whom means hours reconstructing records from paper travellers and memory.
Traceability gaps risk certification
A missing record on a single operation can put a whole batch, and your approvals, at risk.
Complex assemblies, no live status
Multi-stage builds span weeks, and without live status you find out about a hold-up far too late to recover the schedule.
Side by side
Paper travellers and spreadsheets vs DynamxMFG
Generic tools record what someone remembered to write down. Certification needs a record that is created as the work happens, not afterwards.
| DynamxMFG | Paper travellers and spreadsheets | |
|---|---|---|
| Audit trail completeness | Every operation logged with time, job and operator | Depends on signatures being remembered |
| Part genealogy | Full material and operation history held against each part | Rebuilt by hand from files and memory |
| Inspection and NCR capture | Recorded at the operation, mandatory fields block closure | Separate forms, filed later or lost |
| Certification evidence | Produced from live production records on demand | Assembled into a pack job by job |
| Retrieval time for auditors | A search returns the build history in seconds | Hours or days in the archive |
What you get
Everything an aerospace supplier needs. Nothing it does not.
DynamxMFG is built around quality-critical work, from order release through inspection and non-conformance to a complete record of the finished build.
Controlled Works Orders and Routing
Each build runs on its own works order with a fixed bill of materials and an operation route. Operators clock on and off each stage, so the traveller is replaced by a record that cannot be back-filled or signed on someone else's behalf.
Replaces: Paper travellers, route card folders, wet signatures
Quality Capture at Source
Configure measurement, pass or fail and serial number fields on any operation, and make them mandatory so the step cannot close without them. Non-conformances are raised at the bench, against the job, with the operator and the time already attached.
Replaces: Inspection forms, NCR logs, quality spreadsheets
Part Genealogy and Traceability
Batch and serial numbers captured at goods-in follow the material through allocation, consumption and assembly. Every finished part carries the list of what went into it, which operations it passed through and who signed each one off, searchable in one place.
Replaces: Archive boxes, material cert folders, manual trace exercises
Reporting and Audit Evidence
Over 40 built-in reports run from live production data, so an audit request becomes a search rather than an excavation. Pull the history of a batch, a part or an operator, and export the evidence in the form the auditor asked for.
Replaces: Manual audit packs, archive searches, reconstructed records
Genealogy
Genealogy without the paperwork
Every job carries a complete, time-stamped record of every operation and operator. When an auditor asks, the answer is a search, not a week in the archive.
Because inspection results, measurements and serial numbers are captured at the operation itself, the quality record and the production record are the same record. There is nothing to reconcile afterwards.
- Time, job and operator on every operation
- Inspection and NCR data captured at source
- Full genealogy on every part, searchable

The numbers
What manufacturers get from DynamxMFG
built-in reports, from live production data
from kick-off to running on the floor
more production capacity at GMC
on-time delivery at CPL
Rated 4.1/5 on Capterra, GetApp and Software Advice. Our ratings come from public review platforms, not testimonials we picked ourselves.
Getting started
Live in 90 days, not 18 months
We handle the implementation. Your team stays focused on production. Here is what your first 90 days look like.
Establish visibility and a trusted baseline
The first month replaces spreadsheet chaos and guesswork with a single source of live production data.
Regain control and remove obvious waste
With live data in place, your team shifts from reactive firefighting to data-driven action.
Prove the ROI and prepare to scale
The final phase turns your operational improvements into financial evidence.
Customers
What manufacturers say about DynamxMFG
“DynamxMFG is an excellent choice for manufacturers looking to digitise operations without being overwhelmed by complexity.”
“As GMC has grown, it had become harder for me to have such a keen view on components to see if those parts were profitable or not. DynamxMFG enabled us to monitor the machine time and see whether we are making a profit or a loss on each component.”
“The ability to dynamically modify BOMs after release, adding or removing items from work orders, scrapping and reworking parts, has been the single biggest improvement for our business.”
“We chose the system over competitors because of its ease of use, strong customer support and friendly delivery team. So far, everything has matched what was promised.”
“With DynamxMFG, all our production processes are tracked and the relevant data is captured. This increases our control over the business and helps us identify more opportunities to enhance efficiency and quality.”
“Our experience has been positive, and it was definitely worth switching. The support we have received has been extremely helpful. My favourite feature is the integration and automation capabilities.”
Questions
What aerospace and defence manufacturers ask us
How complete is the audit trail?
Every operation is recorded with a time stamp, the job it belongs to and the operator who performed it. Because that happens as part of tracking the work, there is no separate record to maintain and no gaps where someone forgot to sign a traveller.
Can we capture inspection data at each stage?
Yes. Dynamic data capture fields are configured per operation for measurements, pass or fail results, serial numbers and NCR references. Any field can be made mandatory, so the operation cannot close until the data is entered.
How quickly can we answer an audit request?
It is a search rather than an excavation. Every part carries its full genealogy, so you can trace which materials, operations and operators went into a specific build without going back through paper records.
Does it handle multi-stage assemblies?
Yes. Complex builds are tracked operation by operation across weeks, with live status showing exactly where each assembly is and where it is being held up.
Is our data secure?
TotalControlPro is Cyber Essentials certified, and your data stays within your own account. Connections to other systems use secure, authenticated APIs and only share what you choose to connect.
How long until we are live?
Ninety days. We configure routings, quality fields and work centres around your existing process and approvals, so the system reflects how you already satisfy your certification requirements.
See DynamxMFG running your production
Book a 15 minute walkthrough on your products, your order types and your factory layout.
Book a Demo

